- Home
- Resource Center
- Your Home
- Case Study

Case Study Guides
4 guidesCase studies show how building science plays out in real homes and buildings. Each one lays out the original problem, what was measured, what changed and what the results looked like afterward, so you can compare the situation to your own Austin home.
Start with Zilkr on the Park Condo Case Study: Fixing High Humidity, an Austin condo where an older single-stage system couldn't control humidity. Then read U.S. Army Corps of Engineers Case Study, which reviews a government study of the dry fog process used by Pure Maintenance of Central Texas, our sister company.
For background on the variable-capacity equipment in the Zilkr example, our air conditioning services page explains how different cooling systems handle humidity.
- All
- Your Home
- Building Science
- Insulation & Envelope
- Health & Safety
- Tips & Tricks
- Case Study
- Make HVAC Sexy Again
Case StudyZilkr on the Park Condo Case Study: Clammy at 68°F, Comfortable at 74°FA corner condo at Zilkr on the Park felt clammy at 68°F with 65-72% indoor humidity. A 2-ton variable-speed heat pump now holds it…
Case StudySouth Austin Home Case Study: When Nearly New HVAC Isn’t RightBuyers of a South Austin home asked us to inspect three nearly new heat pump systems before closing. We found restrictive ducts, high static…
Case StudyZilkr on the Park Condo Case Study: Fixing High HumidityA 12-year-old 1.5-ton single-stage system in a 1,039 sq ft Zilkr on the Park condo let indoor humidity reach 65-72% even at 68°F. After…
Case StudyU.S. Army Corps of Engineers Case Study: Pure Maintenance Dry-Fog ProcessA U.S. Army ERDC study tested Pure Maintenance's two-step dry-fog process in two vacant Fort Campbell buildings and found large, immediate drops in airborne…

HVAC Systems
Heating
Ductwork & Air Flow
Ventilation
Filtration
Dehumidification
Maintenance
Mold
Remediation & Restoration
Pure Maintenance
Your Home
Building Science
Insulation & Envelope
Health & Safety
Case Study


