Skip to content

Case Studies

Real buildings, real measurements: what the problem was, what changed, and what the numbers showed afterward.

A black and gold Gold Eagle Services HVAC van is parked beside a sunny residential street lined with trees and homes.

Results You Can Check

Each case study below starts with a specific problem, explains the fix, and reports the before-and-after readings. They are written for homeowners and building managers who want to see how a solution performed before deciding on one.

Downtown Austin skyline under cloudy skies above a green tree canopy

Zilkr on the Park Condo: Fixing High Humidity

A 12-year-old 1.5-ton single-stage system in a 1,039 sq ft Zilkr on the Park condo let indoor humidity reach 65-72% even at 68°F.

After an upgrade to a 2-ton variable-capacity inverter heat pump, the condo held 41-46% RH at a 74°F setpoint.

Read the Case Study
A technician kneels on a gray carpet and connects an orange hose to a blue floor-level device inside a bright home.

U.S. Army Corps of Engineers: Pure Maintenance Dry-Fog Process

A U.S. Army ERDC study tested Pure Maintenance’s two-step dry-fog process in two vacant Fort Campbell buildings.

It found large, immediate drops in airborne and surface mold spore counts, with indoor levels about 95-99% below baseline after six months.

Read the Case Study
Mounting the new wall unit in the upstairs office

South Austin Home: When Nearly New HVAC Isn't Right

Buyers of a South Austin home asked us to inspect three nearly new heat pump systems before closing. We found restrictive ducts, high static pressure, suspected mold and a humid attic.

After closing, a full mechanical remodel rebuilt the ductwork and zoning, added a mini-split system and a whole-home dehumidifier.

Read the Case Study

More From the Resource Center

New case studies are added to the Resource Center as projects wrap up. You can also browse our Homeowner Guides for plain-English help with your own system.

Same-day service
BookTextCall 512-489-4653Call